Working as a civil engineer for more than 12 years and on many different teams and on such a large range of projects has allowed me to understand so many different sides of my industry. Early on in my career I worked on a municipal team and focused on roadway/highway designs; mostly designing public utilities associated with the job. I then changed offices to be closer to home and started working more on public site designs focusing on accessibility, optimization of land use, and storm water control. After moving to HHE I started specializing in sports facility design where I have created a positive working relation with many suppliers and contractors that specialize in this work.
Working in all different types of civil environments has taught me how to create plans that exceed expectations in terms of completeness and comprehension.
I pride myself in providing my client with the lowest cost for the best work. Further more, I pride myself in providing them with the most accurate cost opinion possible so they can accurately plan for their future.
In the last several years, I have only had one project where the bids came in more than 5% off my estimate and I believe that was driven by the Covid construction cost hike that was happening daily at the time that project was out to bid.
My knowledge of software allows me to design more efficiently and leaves me with more time to focus on refining my cost estimates. This process is done through a lot of time on the phone just talking with people who preform similar work and knowledge of products and methods needed to complete the job.
Working construction for a small contractor doing large jobs gave me the opportunity to learn so much about the physical world that us engineers virtually design. Everything from site requirements of using different pieces of equipment like scrappers and/or excavators to shape a site to how water main actually gets installed down in the hole. I learned where to expect contractors to cut corners and where engineers often over design.
Understanding how the actual construction of my designs will take place, helps me to provide the most comprehensive plans and helps to ensure constructability which in turn results in less ITCs and change orders.